MALICOUNDA POWER

Completed in 2022, this 135MW diesel combined cycle plant located in Mbour, Senegal was developed under a 20-year BOT contract with the local utility Senelec. The €154m project is being built by Matelec with Wartsila supplying the gensets and contributing to the EPC and O&M. The project is completely developed, financed, and realized by Melec PowerGen (in partnership with Africa50 (30%) and Senelec (15%)) while  the 75% senior debt package is arranged by AfDB, with the participation of BADEA, OFID and BOAD.