KOUNOUNE POWER

completed in January 2008  developed under  a 15-years BOO contract with Senelec. The €68m project was completely developed, financed, and realized by Melec PowerGen (30% equity, 70% long term loans, arranged by IFC, with the participation of ADB, BOAD, Proparco, and CBAO). The project was realized by Matelec in partnership with Mitsubishi, through MHI Equipment Europe, who supplied the gensets and contributed to the EPC and O&M.